Volume 7, Issue 1 (Journal of Control, V.7, N.1 Spring 2013)                   JoC 2013, 7(1): 33-42 | Back to browse issues page

XML Persian Abstract Print


Abstract:   (12532 Views)
This paper presents a new approach for phasor measurement units (PMUs) placement within transmission networks considering risk of observability. To such aim, probabilistic effects of uncertainties imposed to the transmission networks are modeled via Monte-Carlo simulations. Then, risk of observability is introduced as a new objective function and applied to the PMU placement problem. The proposed objective function accompanied by the prevalent cost function leads the transmission network to face with different reliability and observability levels based on its operation point of view. Detailed numerical results and comparisons presented in the paper show that the proposed approach could noticeably improve the quality of problem solutions and can be used as an effective tool for PMU placement within real-life networks.
Full-Text [PDF 1093 kb]   (3327 Downloads)    
Type of Article: Research paper | Subject: Special
Received: 2014/04/18 | Accepted: 2014/04/18 | Published: 2014/04/18

Rights and permissions
Creative Commons License This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.